What to Put on a Custom Rubber Liner Drawing Before an RFQ
January 1, 1970

A usable rubber liner RFQ drawing does more than show the outside shape. It identifies the component, drawing revision, units, datum, lined surfaces, critical dimensions, available lining space, openings, joints, edges and fixing interfaces. It also states the substrate, operating conditions, quantity and supply scope.

If a dimension or requirement is not yet known, mark it as open for review. Do not let each supplier make a different hidden assumption. A clear list of unknowns is more useful than a drawing that looks complete but leaves the quotation basis unclear.

Start With Drawing Control

Before discussing material or price, make sure everyone is reviewing the same document.

· Give the drawing a title, number, revision and date.

· State the unit of measurement and drawing scale.

· Identify the equipment, liner location and item quantity.

· Add section views where thickness, steps, recesses or fixing details cannot be read from the main view.

· Mark customer-supplied reference dimensions separately from dimensions that the supplier must confirm.

· List open points and deviations instead of leaving them to interpretation.

Revision control matters because a technically reasonable offer can still be wrong if it was prepared from an earlier geometry or a different supply scope.

Drawing Information to Show

Drawing field

What to show

Why it affects the quotation

If it is not confirmed

Component identity

Equipment name, item number, location and quantity

Prevents different components from being treated as one item

Mark the component as pending and attach a location photo

Datum and orientation

Reference edge, centreline, flow direction, top/bottom and left/right

Gives suppliers the same basis for measuring and interpreting the part

Ask for a marked-up reference view

Main geometry

Overall dimensions, internal dimensions, profiles and section views

Defines the liner envelope and the amount of material or fabrication involved

Keep the quotation preliminary

Lined surfaces

Clearly shaded or labelled wear faces and excluded areas

Distinguishes the actual lining area from the equipment outline

Request confirmation of each wear zone

Available space

Maximum permitted build-up, clearances and mating surfaces

Helps avoid interference with flow, doors, covers or adjacent parts

Record the clearance as an open technical item

Openings and cut-outs

Holes, slots, nozzles, inspection ports and their reference positions

Small features can change layout and fabrication work

Do not infer locations from photographs

Corners and transitions

Radii, bends, steps, tapers and edge conditions

These areas may need a different detail from a flat surface

Add a section or local detail view

Joints and segment layout

One-piece or segmented concept, joint locations and field access limits

Changes packing, handling, replacement and installation planning

Ask the supplier to state its proposed segmentation separately

Fixing interfaces

Existing holes, studs, clamps, backing plates, bonding surfaces or other interfaces

The word liner does not define how the item is retained

Treat the fixing system as project-specific until confirmed

Substrate

Material, surface condition and whether the equipment is new or already in service

Affects the review of interface and preparation responsibility

State that substrate information is pending

Tolerance and inspection fields

Buyer-required critical dimensions, fit points and inspection records

Allows quotations to be compared against the same acceptance basis

Do not insert a supplier tolerance without project confirmation

 

The table is a review checklist, not a statement of GRAND RUBBER processing range or tolerance capability. Those items must be confirmed for the specific drawing.

Add the Operating Conditions Beside the Drawing

A drawing explains geometry. It does not explain the duty. Include the operating information that may affect material, construction and supply-scope review.

Operating input

Information to provide

Useful evidence

Material handled

Material name, particle or lump-size range, shape and any sharp edges

Process description and representative material photos

Wear mechanism

Predominantly sliding, impact, cutting, slurry exposure or a combination

Wear-area photos marked on the drawing

Loading

Feed direction, drop or impact location, distribution and abnormal events

General arrangement or loading-point sketch

Temperature

Normal and peak material or surface temperature, measurement location and duration

Site records with date and measurement point

Environment

Wet or dry duty, water, oil, chemicals, fines and cleaning method

Operating notes and relevant substance information

Current failure

Local wear, tearing, separation, edge damage, fastener damage or another observed condition

Wide view, close-up and dated maintenance record

Maintenance access

Shutdown window, available access, lifting or handling constraints

Access photos and site procedure reference

Replacement objective

Replace like for like, correct a known fit issue or review an alternative concept

Existing liner drawing, sample or inspection record

 

These inputs support technical review. They do not by themselves prove a cause, predict service life or confirm a final recommendation.

Define the Supply Scope Before Comparing Prices

Rubber lining quotations can refer to different deliverables. Put the required scope on the RFQ and ask every supplier to list inclusions, exclusions and assumptions.

Scope item

Clarification required

Material form

Sheet, cut pieces, fabricated liner, moulded part or another defined supply form

Interface components

Whether holes, backing, fasteners, adhesive-related items or other interfaces are included

Drawing responsibility

Customer drawing, supplier shop drawing, approval drawing or as-built record

Site work

Whether surface preparation, fitting, bonding, fastening, inspection or installation is outside the supply

Inspection documents

Which dimensions, records, certificates or reports are required with the order

Packing and identification

Part marking, drawing revision, quantity per package and any handling limits

 

Do not assume that the words custom liner include installation, adhesive selection, site preparation, hardware, inspection or warranty for the complete lining system. These boundaries must be written into the quotation.

A Practical RFQ Checklist

Before sending the RFQ, confirm that the package includes:

· the current drawing number, revision, date, units and scale;

· equipment and component identification;

· quantity and any left-hand or right-hand variation;

· datum, orientation and flow direction;

· lined surfaces and excluded areas;

· overall dimensions, section views, openings and clearances;

· substrate and existing interface information;

· requested material or a clear request for material review;

· operating conditions and observed wear pattern;

· fixing or bonding interface to be reviewed;

· required supply scope, documents and packing identification;

· a list of unknowns, deviations and items that require supplier confirmation.

How to Compare Supplier Responses

Compare offers only after confirming that they refer to the same drawing revision and scope. Then check whether each supplier has:

· answered the open technical points;

· identified assumptions instead of silently filling gaps;

· listed drawing or material deviations;

· separated material supply from fabrication and site work;

· confirmed which documents will be supplied;

· stated which items remain subject to technical review.

The lowest unit price may be based on a narrower scope or a different interpretation. A useful comparison makes those differences visible before the order is placed.

GRAND RUBBER Review Boundary

GRAND RUBBER's approved company information states that customers can provide drawings, equipment information or operating conditions for technical review. This review is the starting point for confirming the available product, fabrication and document scope for a specific project.

It is not an automatic confirmation of processing range, tolerance, fixing system, installation responsibility, inspection scope, delivery time or performance. Those points remain subject to drawing and project review.

Frequently Asked Questions

Is a CAD file required for the first RFQ review?

Not always. A clear PDF drawing or marked-up sketch can start the discussion if it shows the key dimensions, datum, lining area and open points. Manufacturing or final approval may require a controlled drawing in an agreed format.

Can a supplier infer missing dimensions from photographs?

Photographs help explain location, wear and access, but they should not replace critical dimensions. Any inferred dimension should be returned as an assumption for confirmation, not treated as approved data.

Should the drawing specify the rubber grade?

If an approved grade is mandatory, state it and identify the governing document. If material selection is part of the supplier review, provide the duty and acceptance requirements without inventing a grade from appearance or hardness alone.

What should we do if the tolerance is unknown?

Mark the functional fit points and explain what the liner must interface with. Ask for project review. Do not insert a generic tolerance or assume that one supplier's normal practice applies to every component.

Does a custom liner quotation include installation?

Not automatically. The RFQ should separately state material supply, fabrication, interface items, site preparation, fitting, installation, inspection and documentation responsibilities.

Can a drawing predict liner service life?

No. Geometry and operating data improve the quotation basis, but service life also depends on the actual duty, material, construction, installation, operating variation and maintenance. No life prediction should be made without appropriate project evidence.